Construction, Maintenance & Road Work

| Print This Page |

The Town of Paradise completes a number of construction and road work projects throughout the year. Please see below for new and ongoing projects, and be sure to check back often for updates.

During construction work, the public is reminded to proceed with caution and to expect traffic delays. The Town of Paradise apologizes for an inconvenience that construction work may cause.

 The Town works to update the public on construction plans and the status of various projects as applicable

Topsail Road / McNamara Drive Roundabout

Roadwork at Intersection of McNamara Drive and Burnaby Drive

Beginning 9:00 a.m. Monday, October 22, work will be completed at the intersection of Burnaby Drive and McNamara Drive which will require closing the intersection to all traffic.  It will be closed for approximately three to four days. 

The work is part of the road and sewer upgrades ongoing in the area. While work is completed at the intersection, there will be no access between Burnaby Drive and McNamara Drive and access to the Valley Ridge subdivision will only be available through Tipperary Street. Appropriate signage will be placed in the area, and access to Valley Ridge subdivision through Tipperary Street will be for local traffic only. 

The Town apologizes for any inconvenience caused by this work 

Lane Closure on McNamara Drive (October 15)

McNamara Drive is reduced to one lane on Monday, October 15 as part of the sewer system upgrades project ongoing in the area. The lane closure is expected to last into the evening. Efforts will be made to minimize impact on traffic flow; however residents can expect traffic delays in the area. The Town apologizes for the inconvenience.

Lane Closure on McNamara Drive (October 12) 

McNamara Drive is reduced to one lane on Friday, October 12 as part of the sewer system upgrades project ongoing in the area. The lane closure is expected to last into the evening. Efforts will be made to minimize impact on traffic flow; however residents can expect traffic delays in the area. All lanes will be open on McNamara Drive throughout the weekend. The Town apologizes for the inconvenience.

Roundabout Work Update (October 5)

Work is progressing on the new roundabout for the intersection of Topsail Road and McNamara Drive. The work is being completed in stages in order to minimize traffic interruptions as much as possible. 

The first portions of work are the sewer system upgrades on McNamara Drive and the construction of a retaining wall on the perimeter of the Paradise Plaza ALRE property development (former ACAN site).

The photo below shows the retaining wall. Once these are completed, work will begin on changing the intersection into a roundabout. This road work project will continue through to the end of this year's construction season.

 

Loading

Construction begins for roundabout at Topsail Road and McNamara Drive

The Town of Paradise advises that construction work on Topsail Road and McNamara Drive  will begin the week of September 10, 2018. The work includes changing the intersection of Topsail Road and McNamara Drive into a roundabout along with road upgrades and sewer system work in the area. The road work will continue through to the end of this year’s construction season.

Construction work is scheduled to occur from 7:00 a.m. to 6:00 p.m. Monday to Friday and every second Saturday. During this project, efforts will be made to minimize impacts on traffic flow, especially during peak morning and evening traffic times. 

During construction, the public is reminded to use caution in area. The Town apologizes for any inconvenience caused by this work.  

News Release

 

Map of Construction area for roundabout at Topsail Road and McNamara Drive

  

Road Work

Water & Sewer Work: Pretty Place Blasting Operations Scheduled (October 22)

Blasting work is scheduled to take place on Pretty Place on throughout the week of October 22. As part of the water and sewer work underway on Pretty Place, blasting operations are required to remove hard bedrock.

The contractor has completed the required pre-blast survey and notified residents in the immediate 250m radius zone. The Town has confirmed that the contractor has taken the necessary steps to ensure the safety of the operations and the integrity of the surrounding properties. 

The Town apologizes for any inconvenience caused by this work. 

Pleasantview Ave Limited Access (October 12)

The Town of Paradise is advising that there will be limited access to Pleasantview Ave today (Friday, October 12) to accommodate water and sewer repairs in the area. Local traffic will be permitted through but residents may experience delays. The Town apologizes for the inconvenience.

Lane Closure on Topsail Road (October 8)

The Town of Paradise is advising of lane closures on Topsail Road for Monday, October 8 from 7:00 a.m. to 5:00 p.m.

To accommodate water and sewer work for the Paradise Plaza ALRE property development (former ACAN site), lane closures are needed on a small section of Topsail Road. Between Octagon Heights and McNamara Drive, Topsail Road will be reduced to two lanes (one lane for each direction of traffic).  The lane closures will be in place for one day, all four lanes will be reopened by 5:00 pm.

During the road work, efforts will be made to minimize impact on traffic flow; however residents may expect traffic delays in the area. The public is reminded to use caution in all construction areas. The Town of Paradise apologizes for any inconvenience this road work may cause.

 

St. Thomas Line Road Maintenance  (September 15, 17)
Grind and patch work is scheduled for sections of St. Thomas Line on Saturday, September 15 and Monday, September 17. During this work, efforts will be made to minimize impacts on traffic flow, however residents may experience some traffic delays. Please use caution in areas where work is being completed. The Town of Paradise apologizes for any inconvenience this work may cause.
Paradise Road (June 20)
Grind and patch work on Paradise Road is scheduled to being on June 20 (weather pending).

This work is ongoing and will be completed between 7:00 a.m. and 5:30 p.m. The public are reminded to use caution in area. The Town of Paradise apologizes for any inconvenience this road work may cause.

Line Painting (June 9)

Line painting on Town roads is scheduled to begin on June 9 (weather pending). Annual line painting and maintenance is scheduled to take place over the coming months and includes traffic lines, edge lines, crosswalks, stop bars, margins and arrows throughout the Town.

Work will be completed during times which minimize inconvenience however some traffic slowdowns can be expected. The public are asked to exercise caution while in areas where crews are working.

 

Park, Playground and Trail Work

Paradise Park: Automated Gate Installation

To facilitate the construction of a new entrance and automated gate system to Paradise Park, the main park entrance will be closed to all vehicular traffic for approximately four to six weeks effective October 16. The Park and its amenities will be open, however users will have avail of parking in the Paradise Double Ice Complex parking lot and access the Park via the walkway. 

This project is the latest phase of work as part of the Paradise Park enhancements. It includes installation of an automated gate system at the park entrance and permanent fencing along a portion of the trail system near the Park. The work was scheduled for the Fall to minimize impact on users. 

The Town apologizes for the inconvenience caused by this work. 

Camelot Crescent Playground Repair Work

The Town of Paradise advises that the Camelot Crescent Playground will close effective Monday, September 24 to allow for ground repair work in the area. The playground will be closed for approximately four to six weeks.

To facilitate the repair work, the playground equipment will be removed. Once the ground repairs are complete, the equipment will be returned and the playground will be fully reinstated. The multipurpose courts in the area are not affected by this work and will remain open for regular use. The Town apologizes for any inconvenience caused by this work.

 Neil’s Pond Trail and Octagon Pond Trail

The Town of Paradise advises that maintenance and repair work for the Neil’s Pond Trail and the Octagon Pond Trail will begin the week of September 24.

The work will be completed Monday to Friday and will be on-gong for approximately four weeks. To facilitate the work, at times small sections of the trails may be closed for short periods of time. Users are asked to use caution on the trails and to observe posted signage. The Town apologizes for any inconvenience caused by this work.

Adams Pond Trail (July 20)

UPDATE: Please be advised that Phase III work on Adams Pond Trail has resumed as of September 7, 2018. All necessary approvals and permits are in place for this work. Please use caution in the area as work is completed.

     

The Town of Paradise is advising residents that work is scheduled to begin on the Adams Pond Trail on July 20, 2018. The work is for Phase III of the trail and includes approximately 700m of trail development. The Town of Paradise apologizes for any inconvenience this work may cause.

 

Contact(s)