Construction Updates

Projects for Week of November 2-6, 2020

Ongoing construction projects in the Town of Paradise for the week of November 2-6 include:

  • McNamara Drive: Paving has started for this project; drivers may experience intermittent traffic slowdowns and interruptions. 
  • Paradise Road / St. Thomas Line Intersection: Paving is scheduled to begin for the St. Thomas Line - Paradise Road intersection (weather permitting). Road upgrades on Paradise Road continue. The detour remains in place to divert traffic for a section of Paradise Road (Camrose Drive to St. Thomas Line). Traffic is diverted through Camrose Drive and Deborah Lynn Heights Monday to Friday, 7:00 a.m. to 5:30 p.m.; emergency vehicles, school buses, and those needing local access will not be detoured. Traffic calming will be in place along the detour.  For complete details, including a copy of the detour map, visit www.paradise.ca/roads
  • Tilting Place Lookout: The site grading is complete and the planting and installation of features has started. The project is expected to be completed this Fall. 
  • T’Railway Upgrades: Work has started to upgrade the section of T’Railway (from McNamara Drive to the CBS boundary) and involves widening and resurfacing, as well as appropriate edging, drainage, and accessibility. The section of T’Railway is closed to all users during this time. 

Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 

Projects for Week of October 26-30, 2020

Ongoing construction projects in the Town of Paradise for the week of October 23- include:

  • McNamara Drive: Paving has started for this project; drivers may experience intermittent traffic slowdowns and interruptions. 
  • Paradise Road / St. Thomas Line Intersection: Road upgrades on Paradise Road and the St. Thomas Line intersection continue.  The detour remains in place to divert traffic for a section of Paradise Road (Camrose Drive to St. Thomas Line). Traffic is diverted through Camrose Drive and Deborah Lynn Heights Monday to Friday, 7:00 a.m. to 5:30 p.m.; emergency vehicles, school buses, and those needing local access will not be detoured. Traffic calming will be in place along the detour.  For complete details, including a copy of the detour map, visit www.paradise.ca/roads
  • Sanitary Sewer Smoke Testing: Sanitary sewer smoke testing project is complete; full details on the testing is available on the web page: www.paradise.ca/smoketesting
  • Tilting Place Lookout: The site grading is complete and the planting and installation of features has started. The project is expected to be completed this Fall. 
  • T’Railway Upgrades: Work has started to upgrade the section of T’Railway (from McNamara Drive to the CBS boundary) and involves widening and resurfacing, as well as appropriate edging, drainage, and accessibility. The section of T’Railway is closed to all users during this time. 

Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 

Projects for Week of October 19-23, 2020

Ongoing construction projects in the Town of Paradise for the week of October 19-23 include:

  • McNamara Drive: Road work and sewer upgrades continue on McNamara Drive (from 107 McNamara Drive to the intersection with Kenmount Road and Bremingen’s Boulevard). Drivers may experience intermittent traffic slowdowns and interruptions. 
  • Paradise Road / St. Thomas Line Intersection: Road upgrades on Paradise Road and the St. Thomas Line intersection continue.  The detour remains in place to divert traffic for a section of Paradise Road (Camrose Drive to St. Thomas Line). Traffic is diverted through Camrose Drive and Deborah Lynn Heights Monday to Friday, 7:00 a.m. to 5:30 p.m.; emergency vehicles, school buses, and those needing local access will not be detoured. Traffic calming will be in place along the detour.  For complete details, including a copy of the detour map, visit www.paradise.ca/roads
  • Sanitary Sewer Smoke Testing: Sanitary sewer smoke testing is taking place throughout the Town. The testing is conducted daily, Monday to Friday, from 9 a.m. to 4 p.m. For the week of October 19, testing is scheduled for Topsail Road. This is the final section of Town to be tested. Full details on the testing is available on the web page: www.paradise.ca/smoketesting
  • Tilting Place Lookout: Site development and construction for the new park on Tilting Place is ongoing. The project is expected to be completed this Fall. 

Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 

Projects for Week of October 13-16, 2020

Ongoing construction projects in the Town of Paradise for the week of October 13-16 include:

  • McNamara Drive: Road work and sewer upgrades continue on McNamara Drive (from 107 McNamara Drive to the intersection with Kenmount Road and Bremingen’s Boulevard). Drivers may experience intermittent traffic slowdowns and interruptions. 
  • Paradise Road / St. Thomas Line Intersection: Road upgrades on Paradise Road and the St. Thomas Line intersection continue.  The detour remains in place to divert traffic for a section of Paradise Road (Camrose Drive to St. Thomas Line). Traffic is diverted through Camrose Drive and Deborah Lynn Heights Monday to Friday, 7:00 a.m. to 5:30 p.m.; emergency vehicles, school buses, and those needing local access will not be detoured. Traffic calming will be in place along the detour.  For complete details, including a copy of the detour map, visit www.paradise.ca/roads
  • Sanitary Sewer Smoke Testing: Sanitary sewer smoke testing is taking place throughout the Town. The testing is conducted daily, Monday to Friday, from 9 a.m. to 4 p.m. For the week of October 13, testing is scheduled for the Topsail Road, St. Thomas Line, and Paradise Road (from Topsail Road to Mallow Drive). Full details on the testing is available on the web page: www.paradise.ca/smoketesting
  • Tilting Place Lookout: Site development and construction for the new park on Tilting Place is ongoing. The project is expected to be completed this Fall. 

Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 

Projects for Week of October 5-9, 2020

Ongoing construction projects in the Town of Paradise for the period of September 28 to October 2 include:

  • McNamara Drive: Road work and sewer upgrades continue on McNamara Drive (from 107 McNamara Drive to the intersection with Kenmount Road and Bremingen’s Boulevard). Drivers may experience intermittent traffic slowdowns and interruptions. 
  • Paradise Road / St. Thomas Line Intersection: Road upgrades on Paradise Road and the St. Thomas Line intersection continues. As part of the work, effective, Monday, October 5, a detour will be in place to divert traffic for a section of Paradise Road (Camrose Drive to St. Thomas Line) for approximately two weeks, Monday to Friday, 7:00 a.m. to 5:30 p.m. Traffic will be diverted through Camrose Drive and Deborah Lynn Heights; emergency vehicles, school buses, and those needing local access will not be detoured. Traffic calming will be in place along the detour.  For complete details, including a copy of the detour map, visit www.paradise.ca/roads
  • Sanitary Sewer Smoke Testing: Sanitary sewer smoke testing is taking place throughout the Town. The testing is conducted daily, Monday to Friday, from 9 a.m. to 4 p.m. For the week of October 5, testing is scheduled for the Paradise Road area, from Hussey’s Road to Archibald Drive. Full details on the testing is available on the web page: www.paradise.ca/smoketesting
  • Tilting Place Lookout: Site development and construction for the new park on Tilting Place is ongoing. The project is expected to be completed this Fall. 

Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 

Projects for Week of September 28 - October 2, 2020

Ongoing construction projects in the Town of Paradise for the period of September 28 to October 2 include:

  • McNamara Drive: Road work and sewer upgrades continue on McNamara Drive (from 107 McNamara Drive to the intersection with Kenmount Road and Bremingen’s Boulevard). Drivers may experience intermittent traffic slowdowns and interruptions. 
  • Paradise Road / St. Thomas Line Intersection: Road upgrades on Paradise Road upgrades and the St. Thomas Line intersection continues. Crews are working to minimize traffic interruptions, but traffic delays are expected as the nature of this work makes it impossible to maintain a lane of traffic in each direction all the times.
  • Sanitary Sewer Smoke Testing: Sanitary sewer smoke testing is taking place throughout the Town. The testing is conducted daily, Monday to Friday, from 9 a.m. to 4 p.m. For next week, testing is scheduled for Lanark Drive, Acharya Drive, Challenger Crescent, and Keystone Avenue areas. Full details on the testing is available on the web page: www.paradise.ca/smoketesting
  • Tilting Place Lookout: Site development and construction for the new park on Tilting Place is ongoing. The project is expected to be completed this Fall. 

Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 

Projects for Week of September 21-25, 2020

Ongoing construction projects in the Town of Paradise for the period of September 21-25 include:

  • McNamara Drive: Road work and sewer upgrades continue on McNamara Drive (from 107 McNamara Drive to the intersection with Kenmount Road and Bremingen’s Boulevard). Drivers may experience intermittent traffic slowdowns and interruptions. 
  • Paradise Road / St. Thomas Line Intersection: Phase IV of Paradise Road upgrades and work on the St. Thomas Line intersection is started. Crews will work to minimize traffic interruptions, but traffic delays are expected as the nature of this work makes it impossible to maintain a lane of traffic in each direction all the times.
  • Sanitary Sewer Smoke Testing: Sanitary sewer smoke testing is taking place throughout the Town. The testing is conducted daily, Monday to Friday, from 9 a.m. to 4 p.m. For next week, testing is scheduled for Valley Ridge area, Harcourt Road to Heightview Drive, Spracklin Boulevard, Duff’s Crescent and Sgt Donald Lucas Drive areas, and Sedgewick Street area. Full details on the testing is available on the web page: www.paradise.ca/smoketesting
  • Tilting Place Lookout: Construction of the new park on Tilting Place is scheduled to begin the week of September 14. The project is expected to be completed this Fall. 

Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 

Projects for Week of September 14-18, 2020

Ongoing construction projects in the Town of Paradise for the period of September 14-18 include:

  • McNamara Drive: Road work and sewer upgrades continue on McNamara Drive (from 107 McNamara Drive to the intersection with Kenmount Road and Bremingen’s Boulevard). Drivers may experience intermittent traffic slowdowns and interruptions. 
  • Carlisle Drive / Topsail Rd Traffic Lights: Work on the traffic lights at the intersection of Carlisle Drive and Topsail Road is complete and the new sequencing is operational.  
  • Paradise Road / St. Thomas Line Intersection: Phase IV of Paradise Road upgrades and work on the St. Thomas Line intersection is started. Crews will work to minimize traffic interruptions, but traffic delays are expected as the nature of this work makes it impossible to maintain a lane of traffic in each direction all the times.
  • Sanitary Sewer Smoke Testing: Sanitary sewer smoke testing is taking place throughout the Town. The testing is conducted daily, Monday to Friday, from 9 a.m. to 4 p.m. For next week, testing will continue in the Trails End/Milton Road Subdivisions and the areas of Mallow Drive, Lanark Crescent, and Glenderek Drive. Full details on the testing is available on the web page: www.paradise.ca/smoketesting
  • Tilting Place Lookout: Construction of the new park on Tilting Place is scheduled to begin the week of September 14. The project is expected to be completed this Fall. 

Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 

 Projects for Week of September 8-11, 2020
Ongoing construction projects in the Town of Paradise for the period of September 8-11 include:
  • McNamara Drive: Road work and sewer upgrades continue on McNamara Drive (from 107 McNamara Drive to the intersection with Kenmount Road and Bremingen’s Boulevard). Drivers may experience intermittent traffic slowdowns and interruptions.
  • Carlisle Drive / Topsail Rd Traffic Lights: Work on the traffic lights at the intersection of Carlisle Drive and Topsail Road is complete and the new sequencing will be operational the week of September 8.  
  • Paradise Road / St. Thomas Line Intersection: Phase IV of Paradise Road upgrades and work on the St. Thomas Line intersection is started. This construction season, the upgrades to the intersection of Paradise Road and St. Thomas Line and road widening, storm sewers and installing curb, gutters, and sidewalks on Paradise Road, from the intersection to Rob’s Road. Crews will work to minimize traffic interruptions, but traffic delays are expected as the nature of this work makes it impossible to maintain a lane of traffic in each direction all the times.
  • Sanitary Sewer Smoke Testing: Sanitary sewer smoke testing is taking place throughout the Town. The testing is conducted daily, Monday to Friday, from 9 a.m. to 4 p.m. The areas scheduled for next week are Elizabeth Park, both subdivisions off Karwood Drive and Trails End/Milton Road Subdivisions. Full details on the testing is available on the web page: www.paradise.ca/smoketesting
Line Painting and regular street upgrades, road work and paving are ongoing throughout the construction season. 