The Town of Paradise completes a number of construction and road work projects throughout the year. Please see below for new and ongoing projects, and be sure to check back often for updates.
Crosswalk Lights Out of Service at Topsail Road and Glendarek Drive - August 12, 2022 |
The pedestrian activated crosswalk lights at Topsail Road and Glendarek Drive are out of service due to electrical issues. The restoration and repair time is unknown as the Town is waiting on the required parts to complete the repairs. The Town will provide an update as information on delivery time and repairs is available. Pedestrians are advised to use the crosswalks at Topsail Road and Sgt Donald Lucas Drive or Topsail Road and McNamara Drive until the crosswalk lights can be repaired. Pedestrians and drivers are asked to use caution in the area. The Town apologizes for the inconvenience. |
Karwood Drive Crosswalk Installation - August 8, 2022 |
Construction of a new crosswalk on Karwood Drive is scheduled to begin on Monday, August 8. The project involves installation of a crosswalk, pedestrian island, signage, and rapid flashing beacons at the T’Railway entrances on Karwood Drive. It will take approximately four weeks and the work is planned to be completed by school opening. The work will occur daily from 7 a.m. to 6 p.m., Monday to Friday. Crews will work to minimize the impact on traffic; however, given the nature of this project, traffic interruptions and delays can be expected. Drivers are encouraged to use alternate routes if possible. The traffic lights at the intersection of Karwood Drive and Topsail Road will remain operational during the work. All drivers are asked to use caution in the area and to follow signage and traffic control procedures. The Town apologizes for any inconvenience caused by this work. |
Temporary Lane Re-configurations for Topsail Road - August 4, 2022 |
To ensure the safety of workers and to address traffic flow during the current road work on Topsail Road, the following temporary lane re-configurations are being implemented. Effective 2 p.m. Thursday, August 3, on Topsail Road (from Sunvalley Drive through to Paradise Road intersection area) and Paradise Road, the following is in effect:
These changes are in effect until end of day on Saturday, August 6, when the road work, including paving, is expected to be completed (weather dependent). Drivers are asked to use alternate routes if possible.
All drivers are asked to use caution in the area and to follow signage and traffic control procedures. The Town apologizes for any inconvenience caused by this work. |
Road Closure for Section of Archibald Drive - July 26, 2022 |
A section Archibald Drive, between civic numbers 28-30, is impassable due to the road work in the area. Civic numbers 1-28 on Archibald Drive can be accessed from Paradise Road, while civic numbers 30-35 on Archibald Drive can be accessed via Starlight Drive. The road is expected to be fully accessible by end of day July 27. The Town apologizes for the inconvenience. |
Evergreen Village Upgrades Phase I to Begin - July 25, 2022 |
Phase I of Evergreen Village Upgrade Project is scheduled to begin the week of July 25, 2022. For the 2022 construction season, work will be completed on Ashgrove Drive, Willow Drive and a section of Evergreen Drive (between Ashgrove Drive and Willow Drive). The project involves water and sewer upgrades (installation of sanitary sewer, storm sewer, and watermain infrastructure) and road upgrades on the affected streets (road, curb and gutter replacement). Due to the nature of the work, residents can expect traffic delays and disruptions during the project. Traffic control measures will be on-site for the duration of the project. Residents are asked to use caution in the area and follow all posted signage. In addition, for the safety of all residents, there will be no access from Ashgrove Drive to the neighbourhood playground; it can be accessed from either Iris Place or Elizabeth Drive. The aging infrastructure in Evergreen Village is among the oldest in the municipality and the Town is committed to completing the much-needed upgrades. The overall upgrade project is expected to take several years to complete, with work being planned for 5 Phases. Once completed, residents will have a better and more reliable water and sewer service from the upgraded infrastructure. The Town apologizes for the inconvenience caused by this work. |
Road Repairs for Topsail Road - July 25, 2022 |
Road repairs are planned for sections of Topsail Road starting the week of July 25. The work areas include at the intersection of Paradise Road, near the intersection of Trail’s End Drive / Karwood Drive, near the roundabout and a section from St. Thomas Line and Sedgewick Street. The road repairs are expected to take approximately three weeks to complete, with work ongoing daily from 7:00 a.m. to 6:00 p.m., Monday to Friday. At times, due to the nature of the work, there will be traffic slowdowns, but crews will work to keep traffic flowing. During the work, in the morning, traffic flow will be maintained eastbound with minimal interruptions until 9:00 a.m. and in the evening, traffic flow westbound will be maintained with minimal interruptions beginning at 4:00 p.m. Work will also be on-going on the centre island of the Topsail Road – McNamara Drive roundabout for several days. Minimal traffic interruptions are anticipated with this work. All drivers are asked to use caution in the area and to follow signage and traffic control procedures. The Town apologizes for any inconvenience caused by this work. |
Chicane Installation on T’Railway - July 25, 2022 |
Work will be on-going on the T’Railway, from McNamara Drive to Topsail Pond Road, to install chicanes and supporting signage. The work is scheduled to begin Monday, July 25 and will take approximately four weeks to complete. It will be ongoing Monday to Friday, 7:00 a.m. to 3:30 p.m. The installation of chicanes at intervals along the trail will help to reduce the speed of off-road vehicles used on the trail and will improve trail safety for all users. The trail will remain open during the work, with users asked to avoid construction areas and follow all posted signage. The Town apologizes for any inconvenience caused by this work. |
Tely 10 Road Race Road Closures - July 23, 2022 |
The 94th Annual Tely 10 Mile Road Race is scheduled for Sunday, July 24. To accommodate the start of the race, the following road closures are in place:
Please note that traffic will not be permitted on or across the above noted sections of road during these closures. The Town of Paradise apologizes for any inconvenience these closures may cause. |
Elizabeth Park Refresh: Phase I - July 18, 2022 |
Phase I of the Elizabeth Park refresh is scheduled to begin Monday, July 18. This phase of work will be on the Central Trail between Stephanie Avenue to Canterbury Drive and involves installing a granular surface, and placing armour stone and gates along the trail. The project is expected to take four weeks to complete with work ongoing Monday to Friday, 7 a.m. to 3:30 p.m. The Central Trail will be open during the project, but users are asked to avoid the construction areas and to follow all posted signage. Elizabeth Park, one of the Town's oldest subdivisions, is home to the most concentrated area of residents. The Town recognized the need to update the recreational amenities and features for the neighbourhood and worked with consultants to lead a public engagement process and develop an Elizabeth Park Recreation and Open Space Refresh Plan. The plan will be completed in a phased approach, with Phase I scheduled for completion during the 2022 construction season. |
Archibald Drive Upgrade Project - July 11, 2022 |
The Archibald Drive upgrade project is scheduled to begin the week of July 11, 2022. The work involves installation of a new storm sewer, curb, gutters, and sidewalks. Construction will occur from 7 a.m. to 5:30 p.m. Monday to Friday and will continue for approximately four months. At times, due to the nature of the work, there will be traffic slowdowns, but minimal traffic interruptions are anticipated. Residents are reminded to use caution and reduce speeds in all construction areas. During this project, there will be no access to the Adams’ Pond Trail from Archibald Drive and users are asked to use an alternate access point. |
Work on Paradise Road - July 7, 2022 |
Work is scheduled to resume on Paradise Road on July 7. Crews will be working in the area between Archibald Drive and Holland Place to complete sidewalk installation and landscaping. The work is expected to take approximately three weeks to complete. Minimal traffic interruptions are anticipated with this work and all drivers are asked to use caution in the area and to follow signage and traffic control procedures. The Town apologizes for any inconvenience caused by this work. |
2022 Street Rehabilitation Program - June 22, 2022 |
The Town of Paradise advises that the 2022 Street Rehabilitation program begins tomorrow, Thursday, June 23. This year, road repairs are scheduled for Dawe’s Road, Round Pond Road, Summit Drive, Venton Place, Wynnford Drive, Clarke’s Hillview, Three Island Pond Road, Pollard Avenue, St. Thomas Line and Topsail Road. The work will be completed intermittently throughout the summer with crews on designated sites Monday to Friday from 7 a.m. to 6 p.m. Some weekend work may occur on Saturdays from 7 a.m. to 3 p.m. Minimal traffic disruptions are anticipated for the repairs on local roads. Additional notice will be issued before work commences on Topsail Road and St. Thomas Line. All drivers are asked to use caution in the area and to follow signage and traffic control procedures. The Town apologizes for any inconvenience caused by this work. |
Construction of New Community Garden - June 3, 2022 |
Construction of the new Community Garden is scheduled to begin June 3 and take approximately one week to complete. It is located on Lanark Drive, next to the playground (in the vicinity of civic #370 Lanark Drive). The Community Garden will be a fenced in area consisting of 15 raised beds and four accessible beds. There will be waste bins, a composter, and seating within the area. The construction of the garden will involve heavy equipment in the area and for the safety of all users, the playground will be closed during that phase of work. The playground will open once construction of the Community Garden is completed. Residents are asked to avoid the work area and to follow all posted signage in the area. The Town apologizes for any inconvenience caused by this work. |
Solar Light Installation at Paradise Park - June 2, 2022 |
Solar lights are being installed at Paradise Park along the gravel walkway. The work is scheduled to start June 2 and take approximately two weeks to complete. All park amenities will remain open and accessible while the work is on-going. There may be times sections of the gravel walkway may not be accessible. Park users are asked to avoid the work areas and to follow all posted signage in the area. The Town apologizes for any inconvenience caused by this work. |
Sewer Repairs on Pattison Street - June 1, 2022 |
Sewer repairs are scheduled for Pattison Street for Wednesday, June 1. The work area is between civic numbers 1 to 10, and due to the nature of the work, at times the section of road may be impassable. Local residents will have access to their properties. There is no anticipated impact to residential services as a result of the work. Drivers are asked to respect all posted signed and follow traffic control in the area. The Town apologizes for any inconvenience caused by this work. |
Watermain Break on Topsail Road - May 19, 2022 |
7:45 a.m.: The there is a water main break in the vicinity of 1354 Topsail Road (near the Outer Ring Road overpass) which is affecting the westbound lane and causing traffic slowdowns. Crews are on site assessing the situation and the Town will provide an update later this morning. Drivers are asked to use an alternate route if possible; when in the area drivers are asked to reduce speeds and follow all traffic control. |
Traffic Interruptions at St. Thomas Line and Moonlight Drive - May 16, 2022 |
There is a potential for traffic interruptions at the intersection of St. Thomas Line and Moonlight Drive for the week of May 16. At times, traffic in the area may be limited to one lane. The work is part of the water and sewer installation project for Moonlight Drive. Crews will work to minimize traffic interruptions, but intermittent delays can be expected. Drivers are asked to respect all posted signed and follow traffic control in the aera. The Town apologizes for any inconvenience caused by this work. |
Light Pole Installation at Milton Road Ballfield - May 3, 2022 |
New light poles are being installed at Milton Road Ballfield. The project is scheduled to start on May 3, 2022 and take approximately four weeks to complete, weather permitting. Residents are asked to avoid the construction area and to follow all posted signage. The Town apologizes for any inconvenience caused by this work. |
Construction of New Trail at Copper Canyon Close - May 2, 2022 |
A new pedestrian trail is being constructed from Copper Canyon Close to St. Thomas Line to provide residents access between the roadways. The 70 m long trail will be the newest addition to the Town’s trail system. The project involves installing a granular walking surface, swing gates and armour stone at either end, and a retaining wall and fence constructed along the west boundary of the trail. Work on the trail is expected to begin the week of May 2 and is scheduled to be completed by the end of the month. The construction of the trail will involve heavy equipment in the area and for the safety of all residents, this area will be closed to the public during the work. The trail will open once construction is complete. Residents are asked to avoid the construction area and to follow all posted signage. The Town apologizes for any inconvenience caused by this work. |
Annual Line Painting Starting for 2022 Season - April 22, 2022 |
The 2022 annual line painting and maintenance program is scheduled to start this weekend (April 23). The first part of the work involves placing markings along Topsail Road with full line painting in the area starting next weekend, weather permitting. Over the coming months, the annual line painting work will include traffic lines, edge lines, crosswalks, stop bars, margins, and arrows on roads throughout Town. Drivers are asked to follow all posted signage and to use caution when in the area and around work crews. |
Repair Work on Octagon Pond Tail - April 11, 2022 |
A section of the Octagon Pond Trail will be closed on Monday, April 11 to facilitate repair work. The section of trail, on the eastern side of the pond (between the main parking area and cadet training area) will be closed for one day as a culvert is installed. Residents are asked to avoid the area and to follow all posted signage. The trail is expected to be open by the end of the day. The Town apologizes for any inconvenience caused by this work. |
Work Resumes on Topsail Round Roundabout Centre Island - April 11, 2022 |
Work is scheduled to resume on the centre island of the Topsail Road – McNamara Drive roundabout on April 11. Crews will be onsite to prepare the centre island for landscaping and the work is expected to take approximately one week to complete, weather permitting. The landscaping portion of the project will be completed this summer, when weather permits and it is suitable for planting trees and greenery. Minimal traffic interruptions are anticipated with this work and all drivers are asked to use caution in the area and to follow signage and traffic control procedures. The Town apologizes for any inconvenience caused by this work. |
Water and Sewer Work on Moonlight Drive - March 21, 2022 |
Water and sewer installation is scheduled to begin on Moonlight Drive on March 21, 2022. The project is expected to take 14 weeks to complete with work on-going Monday to Friday, 7 a.m. to 5p.m. Residents are asked to respect all posted signed and avoid the construction area. |
Emergency Force Main Repairs: Topsail Road West - March 11, 2022 |
UPDATE: March 11 7:30 p.m. - The repairs are complete and the road is open in both direction to traffic. **********
Emergency force main repairs are taking place on the west end of Topsail Road, between Spracklin Boulevard and Sedgewick Street. Crews are on site, including heavy equipment and pumper trucks. Traffic control is in place and while crews will work to minimize traffic interruptions, delays can be expected. Drivers are asked to reduce speeds in the area and follow all traffic control and signage. The work is expected to continue throughout the afternoon and there is no impact to services at this time. The Town apologizes for the inconvenience and an update will be provided later this evening.
|
Repairs to Traffic Lights at Carlisle Drive and Topsail Road - February 26, 2022 |
Repair work on the traffic lights at the intersection of Carlisle Drive and Topsail Road is scheduled for Saturday, February 26, 2022. The work will be from 8:00 a.m. to 12:00 p.m., and the traffic lights will be flashing red in all directions while the repair work is completed. All drivers are reminded to treat the intersection as a 4-way stop during this time. During this work, minimal traffic interruptions are expected but there may be traffic slowdowns while the intersection is under a 4-way stop. All drivers are asked to use caution in the area and to follow signage and traffic control procedures. The Town apologizes for any inconvenience caused by this work. |
Road Closure for section of St. Thomas Line - February 19, 2022 |
UPDATE: Repairs are complete and St. Thomas Line is now open to traffic. ******* Effective immediately this evening (6:00 p.m.), Saturday, February 19, St. Thomas Line is closed between Topsail Road and Carlingford Street; all traffic is diverted through Carlingford Street. The road closure is needed to accommodate due to a force main break in the area. Pumper trucks will also be on site. Emergency repair work will begin at 6:00 a.m. on Sunday, February 20. At this time, there is no direct impact on homes in the area. The work is expected to be completed by 6:00 p.m. on Sunday and a further update will be provided. The Town apologizes for the inconvenience. |
Installation of Roundabout Feature - December 6, 2021 |
Construction of the feature for the middle of the Topsail Road – McNamara Drive roundabout is scheduled to begin December 6. The feature is designed to be a tribute to a former landmark of the Town’s history, Octagon Castle, a restaurant, hotel, and gallery built on the shores of Octagon Pond in the late 1800s and was destroyed by fire in 1915. The project is expected to take a couple of weeks to complete and there are minimal traffic interruptions anticipated with work. All drivers are asked to use caution in the area and to follow signage and traffic control procedures. The Town apologizes for any inconvenience caused by this work. |